There are following six phases in every Software development life cycle model:
  1. Requirement gathering and analysis
  2. Design
  3. Implementation or coding
  4. Testing
  5. Deployment
  6. Maintenance
1) Requirement gathering and analysis:  Business requirements are gathered in this phase. This phase is the main focus of the project managers and stake holders. Meetings with managers, stake holders and users are held in order to determine the requirements like; Who is going to use the system? How will they use the system?  What data should be input into the system?  What data should be output by the system?  These are general questions that get answered during a requirements gathering phase. After requirement gathering these requirements are analyzed for their validity and the possibility of incorporating the requirements in the system to be development is also studied.
Finally, a Requirement Specification document is created which serves the purpose of guideline for the next phase of the model.
2)  Design:  In this phase the system and software design is prepared from the requirement specifications which were studied in the first phase. System Design helps in specifying hardware and system requirements and also helps in defining overall system architecture. The system design specifications serve as input for the next phase of the model.
In this phase the testers comes up with the Test strategy, where they mention what to test, how to test.
3)  Implementation / Coding:  On receiving system design documents, the work is divided in modules/units and actual coding is started. Since, in this phase the code is produced so it is the main focus for the developer. This is the longest phase of the software development life cycle.
4)  Testing:  After the code is developed it is tested against the requirements to make sure that the product is actually solving the needs addressed and gathered during the requirements phase. During this phase all types of functional testinglike unit testing, integration testing, system testing, acceptance testing are done as well as non-functional testing are also done.
5)  Deployment: After successful testing the product is delivered / deployed to the customer for their use.
As soon as the product is given to the customers they will first do the beta testing. If any changes are required or if any bugs are caught, then they will report it to the engineering team. Once those changes are made or the bugs are fixed then the final deployment will happen.
6) Maintenance: Once when the customers starts using the developed system then the actual problems comes up and needs to be solved from time to time. This process where the care is taken for the developed product is known as maintenance.

Posted by Unknown at 23:10 No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Testing IMP questions



Manual Testing Important Q & A

  1. What is Quality?
A) Justification of customer requirements is called quality .
2) What is defect?
A) Deviation of customer requirements  is called defect.
3) What is Testing?
A) It is process of identifying the defects, separately maintaining in defect profile document (DPD) and intimating to development team for modifications. This process will continue till application is satisfied client requirements.





Posted by Unknown at 22:21 No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Home
Subscribe to: Comments (Atom)

About Me

Unknown
View my complete profile

Blog Archive

  • ▼  2016 (2)
    • ▼  April (2)
      • SDLC
      • Testing IMP questions
Simple theme. Powered by Blogger.